Kakha Kaladze:
დასრულდება რუსთაველი-მთაწმინდის საბაგირო ხაზის მშენებლობა
ვერდიქტი: არ შესრულდა
30/09/2021Not fulfilledNot fulfilled -
Kakha Kaladze:
Not a single tree will be cut down in the process of the construction of the Tsintsadze (former Saburtalo Street) – Kartozia connecting overpass. All of the trees will be transplanted
Verdict: Kakha Kaladze’s promise was NOT FULFILLED
06/06/2018Not fulfilledNot fulfilled