-
Irakli Kobakhidze:
The total installed capacity of the hydroelectric power plants built in 2007-2012 is eight megawatts whilst the total installed capacity of the hydroelectric power plants built in 2013-2016 is 415 megawatts
29/05/2017Mostly TrueThe application is accurate, but requires additional information and/or definition
Commercial Bank Debtors
-
“The number of hired employees in Georgi...
Mostly FalseIn the statement is the elements of the truth, but the important facts that could have made other impressions -
“The average salary rose from GEL 1,300...
Half TrueThe statement is partly accurate, but the details are missing or some of the issues are without context -
“Exports to the European Union have made...
Mostly FalseIn the statement is the elements of the truth, but the important facts that could have made other impressions